Lecture Theatres Phase 6

Project Details:

Client: Cardiff University
Start Date:
Completion Date: September 2016 
Value: £2m
Sector: Further & Higher Education
Form of Contract: University Framework NEC Form of Contract  


Project Summary:

The works consisted of significant internal alterations, reconfigurations, and refurbishment of Cardiff University Lecture Theatre facilities within the University Hospital of Wales, Cardiff. 

Cardiff Universities' largest single Lecture Theatre (LT1) was fully refurbished including new seating, acoustic wall & ceiling finishes, decoration & soft flooring.  M&E services were reconfigured & updated and a new AV system was installed throughout the theatre.

Lecture Theatre (LT2) was separated into two individual learning spaces with storage beneath a mezzanine floor.  The new learning spaces were finished with no-fixed furniture, acoustic wall & ceiling finishes, decorations, soft flooring, new M&E services, and AV system.

In addition t the above an associated circulatory area known as "The Hatch" was converted into new teaching rooms, student drop-in room, and Cardiff University Boardroom.


Project Teams:

Architect: Stride Treglown 
Engineer: RVW Consulting
M&E Consultant: Houghton Greenlees Associates